After I’d planted the creeping jenny, I came inside to start the moulding in the bathroom with the mitre box I got today. Cove moulding is a PITA for corners because what looks like it should be right…isn’t. I figured it out eventually, but while I waited to be less pissed off, I caulked the tub with silicone.
Did a much neater job on the drip guard than they had.
Sanded and primed the wall repair.
I got only two pieces of moulding up, and the nails aren’t set, but the angle between the wall and ceiling is a gunky mess, and one of the cuts was the weird one over by the shower. Hopefully the rest will go faster. I’m tired.
EDIT: I should’ve been showering, but I threw the final coat of paint on the sides of the printer cabinet (I somehow managed to forget the sides on the first coat, so they were a coat behind), and on the back sides of the doors. One more coat on the front of the doors, and that cabinet is done except for top coat. Now, I’m definitely tired!